Weekly Summary – December 9, 2024
· One min read
Node discussions with IOG site reliability engineering
- Discussed the cloud engineering aspects of Cardano node deployments relevant to Leios
- Received recommendations for updating the cost calculator with predefined cost defaults.
Threat model analysis
- Drafted a section on the Leios threat model analysis, detailing 25 hypothetical threats
- Discussed potential impacts and mitigations.
Rust simulation
- Generated new test data set to match the geographical distribution of mainnet nodes.