Protocol status
Realizing Ouroboros Leios is not a single hand-off from research to engineering, but a progression: the protocol described in CIP-164 is matured through simulation, prototyping, design, implementation and quality assurance until it can be considered for deployment to mainnet. This page tracks where that work currently stands, cut along two dimensions:
- Component stages: the parts of the protocol flow, each progressing through the stages below. Visualized graphically and in a full matrix.
- Release stages: possible increments that can be considered for a rollout to mainnet, as a dimensional plan to node releases.
Component stages
A component moves through these stages, which are deliberately not a waterfall several of them progress in parallel and feed back into each other:
| Stage | Meaning |
|---|---|
| CIP | The protocol-level question is settled in CIP-164; we know what is needed. |
| Prototype | Explored in simulation or on real infrastructure, enough to trust the approach is feasible. |
| Design | How to build it in cardano-node is written down in the technical design. |
| Implementation | Production code exists in cardano-node (and, eventually, other node implementations). |
| Assurance | Confidence gained through formal methods, statistical analysis, e2e and adversarial testing sufficiently high to deploy to mainnet. |
This is a work-in-progress self-assessment
Please read the marks below with several grains of salt:
- They are our own judgement, not a review. The marks reflect how the implementation team sees the state of things at the time of writing. Nothing here has been externally audited, and none of it constitutes acceptance criteria, a commitment, or a schedule.
- Its a moving target. The CIP is mostly stable, but the detailed
node-level design is a
living document and still evolves along with prototyping and confidence
seeking work chapters. Open questions are indicated by
?items, but visibility may be incomplete. - Nothing is "done" until high confidence. A component with everything but the assurance stage marked is not ready for mainnet. Furthermore, attaining high confidence on some components may raise issues with others and may uncover more work.
Click or hover a badge for the full breakdown of a component.
✓Done~Ongoing?Open questionNot started